Main stages of repair in the house

Main phases of repair in the apartment.

How to begin repair works of the apartment?

The first phase of the repair of old homes is the damage and taking apart to start with of the worn out walls and partition walls, eliminating the wall and ceiling finishing. This phase is one of the most "unclean" phases of the repair work.

One more among the most important and "dirty" works is the window block replacement. It is needed to do this first of all since dirt and dust will be unallowable during following stages and it is prohibited at all to open windows throughout painting and wallpaper works (large drops of the temperature level and wetness are unallowable). After installing windows and windowsills it is necessary to pack them right away in polyethylene film and to cover windowsills in addition by the fiberboard (in order to prevent scratches).

The following stage is wiring. Electrical wiring can be set up in walls or along the floor. Electrical wiring is made inside the pipes to ensure electrical security and increase dependability. The pipe safeguards circuitry from external damages and permits to replace the wire entirely without breaking walls and flooring just by placing the new wire rather of the old one.

House Painting follows the circuitry. The regular error throughout the synchronised conducting of such works takes place when workers forget to lay out one of the cable televisions and house painters have actually currently plastered and smoothed out the wall. As a result, extra works are needed to seal chases on the finished wall. The places of the feed switch and wall outlet location and their number should be thought-out beforehand. The scheme of power circuitry is normally included into the style project.

Later on the system must be prepared to service in case of failures. In addition to the electrical wirings, the telephone cable and the TV cable television are set out. plumbing evaluation techniques The power cable television ought to not be set out near the telephone and antenna cable televisions to avoid noise pickup and disturbance. The most peculiar moment is setting out the TV cable television. In order to make 2 (or three) television set in the apartment the second cable television is often merely "firmly soldered" in parallel, so the cable resistance is decreased. As a result, the display quality is deteriorated, many programs can't be received and etc. In order to prevent such situation it is needed to welcome a specialist with special devices. He will determine the signal level of the each TV-feeder and set up TV-amplifiers or TV-filters.

Painting is the most long-term procedure, that is why it is conducted all at once in all facilities, if it is possible. Delays are linked with the technology. Each used layer of the plaster (or filling in ending up) must dry totally before the work will continue.

Works in sanitary plans and the kitchen area start concurrently with house painting. It is much better to satisfy so-called "dirty" operate in the first place and all at once. In accordance with the strategy of the hygienic professional place welding, wall chasing and pipe run are conducted. Steam radiator admissions are prepared, taps and brackets are installed, however radiators are not installed.

Then works in sanitary plans are carried out according to the plan. The bath is mounted, then walls are smoothed out and the tile is laid on walls. The following phase is assembling ceiling and laying tiles on the floor. And at last other sanitary gadgets, mixers and devices are mounted.

After wiring, installation of rosette plates and terminal boxes the voltage is signed in all point. Ends of wiring are insulated and laid out into rosette plates. Sockets and breakers are not set up throughout this phase in order to save their surface look. The finish puttying of walls is conducted simultaneously. The technically precise control of drying of the layer of the plaster (filling) is carried out by drymeter. It is a special instrument that determines moisture of the material.

image

The following phase is the procedure of fill. Fill can be made with different materials-- from usual masonry cement-sand mix to self-aligning floors. The advantage of the basic mix is its cheapness, the drawback is that such mixture is much harder lined up at the level and the last dry time of such fill is 40 days, just then the next phase of the deal with floor can be conducted, i.e. the period is too long. Self-leveling self-aligning floors are a lot more pricey, but more technological. Aligning takes place almost "automatically" i.e. fluid solution of mix is poured out, then it runs and you get the horizontal surface area. The final dry time is 15 days i.e. you have considerable time economy. The system "warm flooring" is set up into the fill. If the so-called "wet procedures" are inapplicable the technology of the dry lining up (the fill innovation) is used bases for floorings with adjustable flooring battens are mounted.

After fill door boxes and door are set up. Setup of doors should take into the account density of future flooring covering. After installation the door can be taken off its hinges and got rid of until completion of repair work or packed into polyethylene movie to safeguard from damages. All at once ceiling can be painted and the tile can be laid in that premises where it was planned. The tile must be laid on the definitely dry overlay.

Finishing of the flooring mounting depends upon the planned covering. For the most part (if finish covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are fixed to the floor by self-tapping screws. One plywood sheet is repaired by 30-50 self-tapping screws to supply the close fixing of plywood and long-term service of the flooring without squeak and bulging. The plywood offers the extra heat- and acoustic insulation. After installing of the plywood is ended up, wallpaper for painting can be pasted on walls.

In facilities where finish covering of the flooring is laminated flooring or parquet stockpile, the normal wallpapers are pasted (not for painting) in the first location. Then the flooring covering is mounted.

If surface covering of the floor is the block parquet, the parquet is laid in the first place, then it is scraped and covered by one layer of lacquer. After this the common wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending on the quality of the parquet and lacquer). The discussed consequence is connected just with such scrambling process when the excellent quantity of dust is produced. In spite of the reality that excellent flooring mills are equipped with the vacuum, the sufficient amount of dust is precipitated on surrounding subjects including walls. Dust is extremely acerbic and is severely cleaned off. That is why in order not to harm wallpapers, they are pasted after rushing and in order the parquet do not absorb the surplus wetness it is covered by the one layer of lacquer before wallpaper pasting.

After this the primary works can be considered to be completed. It is left only to set up the plinths, ornamental elements, breakers and sockets, curtain holders, to hang doors, plant-bands and others.

In conclusion it is necessary to keep in mind that the series of works was listed in basic and can alter depending upon the guaranteed scenario-- the number of rooms in facility, your resources, peculiarities of the construction of the multilevel properties. It is based on common sense and every person efficient in analysis can individually produce such a series.